Chivas Bros

Industrial case study, Colorcoat HPS200 Ultra®, Trisomet®

Chivas Bros Case Study 10
Chivas Bros Case Study 1
Chivas Bros Case Study 2
Chivas Bros Case Study 3
Chivas Bros Case Study 4
Chivas Bros Case Study 9
Chivas Bros Case Study 8
Chivas Bros Case Study 7
Chivas Bros Case Study 6
Chivas Bros Case Study 5
Chivas Bros Case Study 1
Chivas Bros Case Study 2
Chivas Bros Case Study 3
Chivas Bros Case Study 4
Chivas Bros Case Study 9
Chivas Bros Case Study 8
Chivas Bros Case Study 7
Chivas Bros Case Study 6
Chivas Bros Case Study 5
Chivas Bros Case Study 10
Text after image field

The 190,000m2 refurbishment of bonded warehouse building envelopes at the Mulben and Keith sites has resulted in the complete transformation of no less than 38 bonded warehouses.

Each of the Mulben site’s 36 2,000m2 existing warehouses were re-clad in R32 profile on roofs and C32 profile on walls.

The two refurbished warehouses at Keith both feature approximately 20,000m2 of Trisomet® insulated panels.

Client: Chivas Brothers Pernod Ricard

Main contractor: Robertson Group

Installation contractors: Hathaway Roofing, W.R.Simmers, Thomas M.Devon

Cladding system: R32/C32 profiles/Trisomet® insulated panels

Colorcoat® product: Double-sided Colorcoat HPS200 Ultra®

 